Manufacturing

Cost & Lead-Time Optimization

Cost spikes happen when tradeoffs are decided too late.

Cost Delta -10% to -20%
Lead-Time Delta -15%
Tradeoff Window PRE-COMMIT
Risk Envelope DEFINED

Cost Shock Signals

01

Over-spec tolerance

Precision set without a reason.

02

Late routing changes

Re-quotes after tooling decisions.

03

Hidden complexity

Geometry drives cost without warning.

Why Cost and Lead-Time Drift

Late decisions force expensive re-quotes.

Failure Signals

Tradeoffs ignored until the schedule breaks.

Over-spec tolerance

Precision set without a business reason.

Cost spikes

Late routing changes

Process swaps after tooling decisions.

Lead time slips

Hidden complexity

Geometry drives cost without warning.

Budget shocks

From Late Tradeoffs to Modeled Tradeoffs

Cost and time stay controlled when decisions move forward.

Typical Optimization

  • Input: tolerance set by habit
  • Process: routing decisions after quotes
  • Result: cost and lead-time surprises

Geppetto Managed Optimization

  • Input: tolerance tiered early
  • Process: routing compared before release
  • Result: predictable cost and lead time

Optimization Control Console

Controls that keep cost and lead time predictable.

01

COST MODEL

Tradeoffs mapped before commitment.

Proof: cost model
02

ROUTING COMPARE

Alternate paths evaluated early.

Proof: routing comparison
03

RISK ENVELOPE

Cost and lead-time risk bounds set.

Proof: risk envelope
PROOF TEMPLATES

Optimization Proof Templates

Templates that document tradeoffs before release.

TEMP-01 Standard

Cost Model

Tradeoff model with cost drivers and assumptions.

XLSPDFNOTES
Cost driversAssumptionsTarget delta
02

Routing Comparison

Standard

Alternate process paths evaluated early.

PLANPDFLOG Path optionsLead time deltaRisk flags
03

Risk Envelope

Standard

Boundaries set for cost and schedule risk.

PDFNOTESLOG Risk bandsEscalation triggersApproval log

Outcome Commitments

Tradeoffs decided before they become cost spikes.

Outcome

Lower cost

Optimization without unmanaged risk.

Outcome

Shorter lead time

Routing decisions made early.

Outcome

Fewer surprises

Risk envelope defined upfront.

Optimization Specs

Cost Model Mapped
Routing Compared
03

Risk

Bounded

04

Lead Time

Planned

Submit for Tradeoff Review

Share targets to model cost, lead time, and risk before release.

Submit design package

Submit for Process Control Review