Capabilities

CNC Capabilities Mapped to Managed Control

Capability selection is tied to geometry risk, tolerance strategy, and validation evidence before machining release.

Capability Framework

PROGRAM MATRIX

CAP-01

Managed Control

Control points we lock before release to eliminate process drift.

Control Points Open

CAP-02

Tolerance Tiers

Tiered tolerance bands that drive inspection depth and risk flags.

0.05 / 0.01 / 0.005 mm Open

CAP-03

Material Families

Material risk grouped by machinability, heat sensitivity, and verification needs.

Verified Lots Open

CAP-04

Program Stages

Stage-specific control from prototype sprint to ramp stability.

Stage Fit Open

Managed Capability Matrix

Capability is defined by control actions, not just machines.

Evidence ControlEvidenceOutcome
Managed Control Process lockControl summaryPredictable routing
Tolerance Tiering Tiered scopeInspection planStable assembly fit
Material Families Lot verificationMTR/COCRisk containment
Program Stages Stage gatesMilestone logStable scaling
Decision Rule

Control before commitment

We lock control and evidence scope before release to avoid drift.

Capability Guardrails

Scope rules that keep programs inside controlled execution.

[OK] Primary focus: subtractive precision programs
[OK] Add-ons: precision assembly and surface treatment
[OK] No basic sheet metal welding
[OK] No low-end mass injection molding
[OK] No non-precision structural parts
Scope Locked

Capability fit before control

We confirm scope before process control and inspection depth are approved.

Capability Evidence Pack

Standard evidence assets issued with every capability engagement.

EVIDENCE PACK
PACK-01 Standard
CONTROL SUMMARY
Control scopeRouting notesRisk tags

Control Summary

Process control, inspection scope, and routing constraints.

PDF NOTES PLAN
Control scopeRouting notesRisk tags
PACK-02 Standard
QUALITY PLAN
Inspection tierCritical dims listMethod assignment

Quality Plan

Inspection tiering and sampling cadence by risk.

FAI CMM PDF PLAN
Inspection tierCritical dims listMethod assignment
PACK-03 Optional
EXTENDED PROOF
CMM reportFAI reportDeviation log

Extended Proof

Expanded measurement and audit documents for regulated work.

FAI CMM PDF XLS COC MTR
CMM reportFAI reportDeviation log

Submit for Capability Fit Review

Share geometry, tolerances, and delivery targets for a capability fit review.

Submit design package